Tear Drop
Week 9 7/20/2002
A great day to skin a teardrop
Then the aluminum is set down and rolled into place.
Then on the side's goes contact cement, spacing strips and then the sheets of aluminum.
Greg figured out how to cut out for the doors with the Rotozip. No, the guys are not taking a break but thinking how best to cut down the aluminum since the long-ago ordered air shears never arrived.